Accessibility Tools

×

Warning

JUser: :_load: Unable to load user with ID: 116

The water break the RM of Dauphin has have working on is much more significant than anticipated. 

 

A large amount of pipe had to be ordered and will arrive tomorrow morning.

At this point the RM can advise that an isolated area will be without water until the repair is complete, which is anticipated to be late tomorrow. 

Those residents have been, or will be contacted by phone or email.   

All other residents on the Phase 1 water line may be experiencing reduced pressure and at some times loss of water, while the system is being restored. 

The RM appreciates your patience in this matter.